Surge Protection is the future

Posted on 17th December, 2014

We have intalled surge protection at Kepston Limted to protect the precision machinery. Kepston count Merecdes Motorsport as one of their clients and carry out work on their Formula one engines.

 

On the strength of this order we have also completed a similar system at Erodex UK Limited. Erodex count Rolls Royce jet engines as one of their key clients. A lot of their work is precision grinding for turbine manufacture.

 

Both clients offer unrivalled service to their blue chip clients and will benefit from increased reliability of their machines following the installation of surge protection.

Make A Comment

Characters left: 2000

Comments (0)